top of page
Design · supply · build · Essex

Evonic Fires Media Walls Essex

Evonic fires built into bespoke Essex media walls, with the fire width, recess depth and TV planned together under one contract.

Evonic Kinver FD: formerly e-lectra

The current Kinver full-depth range has a 1.5kW heater, 11 adjustable flame styles, British Woodland logs and a black rear screen. Published sizes run from 800 to 1800, with two- or three-sided conversion panels. E-smart app and remote control are listed for the range, with compatible voice-control options.

Evonic ranges differ. We use the current drawing for your exact appliance and configuration rather than assuming an older e-lectra installation detail applies to every new model.

Current Kinver FD specifications · Evonic installation manuals

Balancing the fire and the TV

An Evonic fire and the TV above it should look like they belong together. We compare the fire's visible width with the screen, decide how much wall should show between them, and plan the recess depth from the installation drawing. A wide fire under a narrower TV can work well, but the heat outlet and clearances still come first.

Proportions we check

  • Visible fire width against the TV width.
  • Gap between the fire and the screen.
  • Recess depth from the installation drawing.
  • Shelving and lighting either side.

Safe-Zone TV mounting: plan the complete heat path

“Safe-Zone” means a layout checked against the exact fire and television instructions, not a universal gap or a separate certification. Before construction we confirm the appliance opening, required non-combustible materials, air inlets and outlets, TV ventilation, bracket support and maintenance access. A clearance in front of a fire is not the clearance above it.

Many domestic media-wall fires sit in the 1kW–2kW output class, but the actual model governs the design. AmberGlo AGL068W is rated at 1.8kW, New Forest 1600 and Evonic Kinver FD at 1.5kW, and Gazco eReflex offers up to 2kW. Do not assume every fire has identical heat settings or dimensions.

Read our TV and fireplace clearance guide

One fixed contract for the agreed build

Every turnkey build includes a free home design consultation, structural timber framing, fire-rated board where required by the selected specification, NAPIT-certified electrical first and second fix, a smooth skim plaster finish and a full tidy-up. We set out the TV support, recessed sockets, concealed HDMI route and accessible power isolation before closing the structure.

Your written quotation names the fire, lighting controls, shelves, cupboards and finish included. App-controlled shelving LEDs can be specified alongside remote-controlled or app-enabled fires; these are separate systems unless a compatible integrated kit is selected. Television supply, premium appliances and additional preparation are confirmed separately. Final decoration is included only where your chosen package or quotation says so.

Installation and finishing visits

  1. First two working days: protect the room, set out the design, build the supported frame and complete the agreed electrical first fix and boarding.
  2. Plastering visit: plaster the agreed surfaces, then allow them to dry before finishing.
  3. Return visit, normally two working days: complete the agreed decoration, fit equipment and lighting, test controls and hand over.

A typical plastered design is planned over three working days for construction and plastering, followed by two finishing days in a later visit once surfaces are ready. A design without plastering has a different programme. Your quotation confirms the scope, drying allowance and agreed visits.

Evonic Fires Media Walls Essex — questions answered

How wide should the fire be compared with the TV?

It's a design choice. We'll show you options that balance the two while meeting the clearances.

How deep is the recess for an Evonic fire?

It depends on the model. We set it from the installation drawing.

Can an Evonic fire have a TV above it?

Yes, where both sets of instructions are met. We plan the heat path before framing.

Do you supply the fire?

We can include it in the quote, named by model.

Your room. Your ideas.

Let’s make it
part of your home.

Start with your phone number and postcode. Room photos help us understand the space, but you do not need measurements or a finished design to get in touch.

How we handle your enquiry

What happens next?

  1. We look through your ideas and room details.
  2. We get in touch to discuss the design and anything else we need.
  3. We explain the next step towards your quote.

5.0 on Google · 38 Media Walls reviews Read customer reviewsChecked 11 November 2026

bottom of page